Resumen
This document describes technical measures to be carried out at crossings and parallelisms of buried metal pipelines influenced by HVDC systems. It provides guidance on how the design, construction, operation, maintenance, and decommissioning phases of HVDC systems affect buried metal pipelines. Electrical interference conditions (AC and DC) to pipeline systems are described, and acceptable levels of interference are discussed. Minimum separation distances are recommended. The following aspects are not covered in this document: -Contractual responsibilities -Personnel safety
Informaciones generales
-
Estado: En desarrolloEtapa: Nuevo proyecto registrado en el programa de trabajo TC/SC [20.00]
-
Edición: 1
-
Comité Técnico :ISO/TC 67/SC 2
- RSS actualizaciones
Ciclo de vida
Got a question?
Check out our FAQs
Customer care
+41 22 749 08 88
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)